News

  • 0
  • 0

Global Foam Lightweight market trend 2022-2027 Construction Precautions for Foam Lightweight Soil by Newsarchitectureboitte

The European Commission has submitted to member states a new draft of sanctions against Russia, including an oil embargo. Some member states that rely heavily on Russian energy sought exemptions.  

Western media reported that the European Commission draft of the sixth round of sanctions against Russia includes within six to eight months gradually banning oil imports from Russia, but allowing Hungary and Slovakia to extend the transition period for several months; The Russian Savings bank and other large financial institutions on the sanctions list.  

The European Union has imported 44 billion euros of fossil fuels from Russia since Russia launched its special military operation against Ukraine in late February, according to Finland's Energy and Clean Air Research Center.  

The Institute for European and Global Economics in Brussels estimates that the European Union currently consumes about $450 million worth of Russian oil a day.  

Among EU members, landlocked Hungary and Slovakia, which import most of their oil from Russia, cannot quickly find alternative supplies.  Slovakia says the transition will take years.  Some officials believe Bulgaria and the Czech Republic may also seek to opt out of oil sanctions against Russia.

Affected by the ever-changing international situation, the supply and prices of international bulk Foam Lightweight are still very uncertain.


The filling elevation of the foam light soil with different strengths shall be constructed in strict accordance with the design requirements. The anti-seepage geomembrane on the top of the foam light soil subgrade shall be laid under the metal mesh, and the lap joint shall be thermally welded, and the lap width shall not be less than 10cm. 

When laying, it should be flattened and tightened to avoid local rolling up. If necessary, U-shaped nails can be used for anchoring. When laying the metal mesh, U-shaped nails should be used for anchoring, the longitudinal anchorage spacing is 2m, and the transverse anchorage spacing is 1.0m. The plane position of the metal mesh should be overlapped and overlapped, the width of the overlap should not be less than 5cm, and the overlap should be bound with plastic buckles and anchored with U-shaped nails.


Before the light soil is poured, according to the boundary conditions of the construction site, the pouring area and the pouring layer are first divided, and the base is checked to ensure that the base is free of debris and water, and that the base elevation meets the design requirements and should meet the following requirements:

1) The top surface area of a single pouring area should not exceed 400m2.

2) The length in the long axis direction of a single pouring area should not exceed 20m.

3) 1.8cm thick wooden plywood is used to support the spacing and joints in the adjacent pouring area. The wooden plywood is a temporary support template and is also used as a deformation joint filling and must not be removed.

4) The thickness of the single-layer pouring layer should be controlled within the range of 0.3-1.0m.

5) The thickness of 0.8m at the top of the light soil subgrade must be used as an independent single-layer pouring layer, and the layer should be poured at one time in each pouring area.


Construction Control Points

1) For the adjacent pouring layers in the same section, when the temperature during the construction period is not lower than 15℃, the shortest pouring interval can be controlled by 8 hours; otherwise, the pouring interval should not be less than 12 hours.

2) The pouring construction time of the pouring layer in a single pouring area of foam light soil should be controlled within 2 hours.

3) It should be poured from one end to the other end along the long axis of the pouring area; if more than one pouring pipe is used for pouring, it can be poured side by side from one end, or the diagonal pouring method can be used.

4) During the pouring process, when the pouring pipe needs to be moved, it should be moved back and forth along the direction in which the pouring pipe is placed, and it is not appropriate to move the pouring pipe left and right; Move to the soil surface.

5) During the pouring process, the discharge port of the pouring pipe should be placed below the current pouring surface as much as possible; in other cases such as the surface being smoothed, the distance between the discharge port of the pouring pipe and the current pouring surface should not be higher than 1.5m.

Care and Maintenance

After the top surface of the light soil pouring area is poured to the design elevation, the surface should be covered with plastic film to moisturise and maintain the light soil roadbed; or non-woven geotextile covering and watering should be used for maintenance. The curing time is not less than 7 days. 

Before the top of the light soil subgrade is filled with soil, it is strictly forbidden to drive construction machinery on it; if it is unavoidable in some areas, a temporary protective layer with a thickness of not less than 50cm should be laid at a suitable position or covered with steel plates as a temporary access road for Construction machinery travels.


Connection with other processes

The top improved soil must be constructed when the maintenance strength of the light soil under the same conditions reaches 1.5MPa. During construction, it is strictly forbidden for large machinery such as dump trucks, road rollers, and bulldozers to directly walk on the top surface of the light soil. Paving and rolling are carried out in the forward way of leveling and rolling, that is, unloading trucks and road rollers should unload and walk at the rear end of the leveling machine.


During the rainy season, special measures should be taken to prevent and drain the water and soil, especially to prevent water and soil loss. Measures such as film covering and setting of temporary drainage ditches should be adopted to avoid slope erosion and prevent a large amount of water and soil from flowing to the lower light soil pouring surface for pollution. Light soil.


TRUNNANO is a concrete additives supplier with over 12 years experience in nano-building energy conservation and nanotechnology development. We accept payment via Credit Card, T/T, West Union and Paypal. Trunnano will ship the goods to customers overseas through FedEx, DHL, by air, or by sea.

If you are looking for high quality foaming agent, please feel free to contact us and send an inquiry.

sales@cabr-concrete.com


The EU’s draft REPowerEU plan calls for an increase of 15TWh of rooftop PV capacity by 2022. The draft also calls for EU and national governments to take action this year to reduce the time required to obtain permits for rooftop PV installations to three months, and proposes that "all new buildings and existing buildings with an energy grade OF D or above should have rooftop PV installations by 2025".  

In addition, the European Commission is likely to set a target for installed PV capacity of 300GW by 2025 and 500GW by 2030. Some members are more aggressive, with Austria, Belgium, Lithuania, Luxembourg, and Spain demanding a 1TW target for 2030.  

The REPowerEU initiative, worth 195 billion euros, was proposed by the EU on March 8 to phase out member states' dependence on Russian fossil fuels by 2030. In a few days, the European Commission will present a package to implement the RePowerEU strategy.  

As an important application scenario of distributed PV, rooftop PV is not limited to land, and the development conditions are relatively convenient.  

Since the end of 2021, Spain, France, the Netherlands, and other countries have introduced policies and measures such as government subsidies, tax cuts, fee reductions, and accelerated grid-connection approval to encourage the development of distributed PV.  Europe's potential for rooftop PV is huge and will continue to be an important growth pole for the industry, according to Wood Mackenzie.

Luoyang Tongrun Nano Technology is a trusted chemical supplier and manufacturer providing high-quality chemicals and Nanomaterials. If you are looking for the Foam Lightweight, please feel free to contact us and send an inquiry.

Inquery us

Our Latest News

Global tungsten carbide powder market trend 2022-2030 Why Use Tungsten Carbide Over Other Metals? by Newsarchitectureboitte

Wholesale gas prices in the Netherlands and the UK have risen 20 percent recently amid concerns about Russian supplies.The EU plans to cut its dependence on Russian gas by two-thirds this year and stop importing Russian fossil fuels by 2027. Russia e…

Global amorphous graphite market trend 2024-2029 Do you knnow amorphous graphite? by Newsarchitectureboitte

Amorphous graphite is usually formed by contact metamorphism of anthracite coal seams with metamorphic agents (e.g. tectonic stress, magma, etc.).…

Global Zinc Oxide, Zinc Oxide Overview, Zinc Oxide Application, Zinc Oxide Suppliers, Zinc Oxide Price market trend 2024-2030 What is Zinc Oxide? by Newsarchitectureboitte

Zinc oxide is an oxide of zinc, the chemical formula is ZnO. It is insoluble in water, soluble in acids and strong bases.…